Part 5 Introducing the specific usage of EPE!

We will explain in detail how to use the PowerPlay Early Power Estimator (EPE) external link, which is intended for selecting a power supply for the Cyclone® V SoC (5CSXFC5D).

 
In the previous column, I introduced how to determine FPGA power and select a power supply using EPE in five steps. This time, I will introduce a more specific method for using EPE to check the power rails.

Understand the power supply specifications based on the type of FPGA and prepare pin connection guidelines

First of all, understand and prepare the following two points.
  • Select FPGA (Devices are narrowed down by accuracy of output voltage)
  • Be prepared by opening the target device family page of the pin connection guidelines so that you can quickly check the necessary information.

start design

Now let's start power supply selection using EPE.

Select FPGA usage conditions Part 1

<Image 01>

Now let's start power supply selection using EPE.

  • Select Device on the Main tab. (See image 01 <1>)
  • Select Power Charactrization as Maximum. (See image 01 <2>)
  • Select Power Rail Configuration in some cases.
  • This time I chose SX FPGA and HPS Shared. (See image 01 <3>)

Select FPGA usage conditions Part 2

  • Enter the required information on each tab. (This time, enter only the Logic tab)
  • It is assumed that Look Up Table, FF, and Clock Frequency are used with the selected device fully utilized. (see image 02)
  • When you return to the Main tab, the current consumption increases due to the above settings, and a warning is displayed in red. (see image 03)
<Image 02>
<Image 03>

Clear warning

  • If you select the Report tab, you'll see that two different voltages that should be distinguished are now one power rail. (see image 04)
  • Since we can see that a 1.5V rail is mixed in with the 2.5Vin rail, we will increase the number of rails by changing the Regulator Group value of the 1.5Vin rail from 2 to 3. (See Image 05)
  • The error has been resolved and the number of regulator groups has increased. (See image 06)
<Image 04>
<Image 05>
<Image 06>

The above is a concrete example of how to check the required power rails using EPE. However, depending on the design, the current consumption and the need for additional power rails may vary. Please use EPE while checking each case individually.