Site Search

Do Straix V devices have a power-down sequence?

Category: Specifications
tool:-
Device: Stratix® V


The power sequence of the Stratix® V (power-on (start-up) or power-off sequence) is as follows.

■ Power-Up Sequence

Power sequence must be observed.
For more information, please refer to the following documents.
Also note that each power supply is required to increase monotonically and rise to each voltage level within the specified time (tRAMP).

■ Power-Down Sequence

All supplies must be powered down simultaneously and reach 0V within 100ms of the start of powering down all supplies.

This content is published in the Knowledge Database.
https://www.intel.com/content/www/us/en/programmable/support/support-resources/knowledge-base/solutions/rd10202011_452.html


Reference information
https://www.intel.com/content/dam/www/programmable/us/en/pdfs/literature/hb/stratix-v/stx5_core.pdf
(Search for Power-Up Sequence, tRAMP, Power-Down.)
https://www.intel.com/content/dam/www/programmable/us/en/pdfs/literature/hb/stratix-v/stx5_53001.pdf
(Search for tRAMP.)



Experienced FAE
Free consultation is available.

From specific product specifications to parts selection, the Company FAE will answer your technical concerns free of charge. Please feel free to contact us.