This event has ended.

Event features

Explanation in 15 minutes! What are the benefits that can be obtained by avoiding the biggest risk "downtime" at the production site?

How can we prevent the biggest risk at the production site, "downtime occurrence", failures and accidents that can occur suddenly? Are you having trouble?

In the seminar introduced this time, we asked many customers in the manufacturing industry about "the current situation and issues to prevent downtime", and developed from the experience of receiving consultations. "Predictive maintenance service specializing in low-voltage three-phase motors" that "predictive maintenance of equipment can be easily performed without manpower" and "power cost reduction and CO2 reduction" can be obtained. Introducing We will also explain the introduction case in Japan and abnormal test data.
[Holding: 9/26-11/30] It's an on-demand video, so please watch it when you have time during the period. We are looking forward to your participation!

[Viewing benefits] We will provide the following to those who have responded to the questionnaire after viewing.
・Lecture materials (PDF), installation method & installation guide (viewing URL)
* We also have a limited number of free rental campaigns, so we recommend that you apply for participation as soon as possible.

Recommended for people like this!

*This service is specialized for low-voltage three-phase motors (AC, induction, three-phase, cage type).
・Those who want to consider predictive maintenance of low-voltage three-phase motors
・People who are having trouble with the current state of equipment maintenance
・Those who want to perform simple and efficient predictive maintenance without manpower
・ Those who want to know the introduction results of predictive maintenance
・People who have introduced predictive maintenance products but are having trouble setting thresholds, etc.

Schedule/Application

schedule time venue Capacity Application
2022/09/26 (Mon)
~
2022/11/30 (Wed)
  • Video - 15 minutes

You can watch it anytime on your own PC during the period until 11/30 (application start: 9/26-)

  • Unlimited
End of reception

agenda

time content
about 15 minutes

Zero production site downtime! 〜Predictive maintenance service specializing in low-voltage three-phase motors〜

1. Development background
・Five risks due to downtime
・Current status and issues to prevent downtime

2. What is Macnica Smart Motor Sensor?
・Product features
・About the dashboard screen
・ Benefits that can contribute other than downtime
- Adverse effects of low efficiency caused by motor malfunction
- Abnormal test results 1 to 3 for locations that can be monitored by SMS
- Simulation of electricity charges and CO2 emissions due to motor efficiency degradation

3. Implementation record

4. Notice of free rental campaign

Organized and operated

Macnica Ultima Company

Notes

・Participation of competing manufacturers and agents may be refused. Thank you for your understanding

Inquiry

Inquiry